Feb 24, 2017 09:57
7 yrs ago
English term
want the report to include data up to
English to Russian
Tech/Engineering
Electronics / Elect Eng
Content: Technical UI
Allows you to enter the date you want the report to include data up to.
Click the Calendar icon and use the arrows to navigate to the correct month and then select the desired day.
Partition
Allows you to select a specific library partition.
Select a value from the drop-down menu.
Click the Calendar icon and use the arrows to navigate to the correct month and then select the desired day.
Partition
Allows you to select a specific library partition.
Select a value from the drop-down menu.
Proposed translations
(Russian)
3 +3 | ...ввести (желаемую) конечную дату отчетного периода | Roman Karabaev |
3 +2 | по которую необходимо включить/включаются данные в отчете | Mikhail Zavidin |
3 | см. | Nadezhda Golubeva |
Proposed translations
+3
2 mins
Selected
...ввести (желаемую) конечную дату отчетного периода
Позволяет ввести желаемую конечную дату отчетного периода.
Это все предложение.
Это все предложение.
4 KudoZ points awarded for this answer.
+2
12 mins
по которую необходимо включить/включаются данные в отчете
Allows you to enter the date you want the report to include data up to. —
Позволяет ввести конечную дату, по которую необходимо включить/включаются данные в отчете.
Позволяет ввести конечную дату, по которую необходимо включить/включаются данные в отчете.
16 mins
см.
Позволяет установить (ввести)интересующую вас конечную дату, относительно которой вы хотите получить отчет.
Something went wrong...